Winner W2 is the solution for medium-high performance loading and unloading lines, where high handling speed and security of panel detachment are the pre-requisites for loading continuity. Ideal for flexible boring processes, where required productivity is of 22-26 panels per minute.
Guaranteed efficiency and reliability thanks to automatic set-ups and a piece detachment system for any type of panel stacks, both singe or double-row. It consists of slanted blades with integrated air jet, which, apart from ensuring panel detachment, guarantees the alignment of the panel stack at picking stage.
Automated management system for loading panels in double rows. It guarantees perfect production line timing.
- System efficiency.
- Seamless integration.
- Perfect synchronisation.
- Factory optimisation.
- Reduction of manual operations.
- High flexibility.
Please contact us for more information.