6 x high intensity LED light
heads that are individually
adjustable for both pan and tilt
• Very low fuel use of 1.2
litres per hour
• 250 hours of run time before
refuel is required
• Programmable automatic
start / stop times
• Mast rotates 360 degrees
• Retractable draw bar for
compact storage and transport
The Alfasi Group, based in Melbourne, Australia, is a leading construction and engineering group with a diverse range of services ranging from structural steel fabrication and erection, drafting services, equipment hire, project management, design and construct of facade and structure packages and turn key projects.
The Alfasi Group employs over 250 staff ranging from project managers, project engineers, design and drafting, quality assurance, O H & S supervisors, steel erection crews as w