Completed Vertical Drilling set up Scania R500 500HP 2 hydraulic ramps 9-metre tray and 2000 litre water tank and mud mixing system.
2 x Vermeer D20x22FX one at 1600 hours, other rig at 1900 hours drill rigs set up with additional pumps for tight access Geothermal/Vertical drilling.
The recycling Unit that is coupled to the drill rigs is excellent at keeping the site clean while drilling, even in existing residential sites in suburbia. over 20 drill heads Tri Cones PCD Drag Bits. Hydraulic mud pumps Wacker Neuson 2-inch Diaphragm pump
Trash pumps, Drill Rig Spares.